ADVERTISEMENT - LOGIN OR REGISTER TO HIDE

Pirates of the Caribbean — 2013 refurbishment

Author Topic: Pirates of the Caribbean — 2013 refurbishment  (Read 8385 times)

claire2281

  • You can fly! You can fly! You can fly!
  • *****
  • Posts: 853
Re: Pirates of the Caribbean — 2013 refurbishment
« Reply #30 on: March 24, 2013, 11:30:48 AM »
Quote from: "doddy13"
We are some 5 days after a 3 month refurb.  
The dueling pirates are broken (again)
The swinging pirate isn't swinging.  

This is my favourite ride, but seriously?  All these things that stop working just annoy me.

This is faintly ridiculous tbh. I rode it at Christmas, shortly before it closed for refurb and I have to say it was the best I've ever seen it with all elements working properly. So they've managed to do a mass refurb for 3 months and somehow now it DOESN'T work?

Dear oh dear...
« Last Edit: January 01, 1970, 01:00:00 AM by Guest »
My Trips:
03/2009 DCR -- 07/2009 DLH -- 03/2010 Cheyenne -- 07/2010  DLH -- 12/2010 SL -- 03/2011  Cheyenne -- 08/2011 NBC -- 12/2012 HNY -- 03/2013  Cheyenne - 12/2014 SL -- 03/2016 Cheyenne -- 07/2017  Cheyenne - 12/2017 SL - 08/18 - Cheyenne - 12/2018 NBC - 07/2019 Cheyenne